Skip to main content

Import calibration certificates

· 4 min read
Jan Wittkamp
CEO @ Memida GmbH

When several calibration certificates arrive from the lab, the work often starts with transferring details and finding the corresponding inspection equipment. The new import under Inspection reports → Import brings these tasks together: Memida reads PDF and DCC files, suggests matches, and prepares the inspection reports for review.

This lets you process larger batches of documents together while retaining responsibility for the technical decision on each result.

Fig. 1: Calibration certificates and their assignment to inspection equipment

Multiple documents, a reviewed import​

You can upload PDF and DCC calibration certificates (1) together and review each one before importing it. Memida compares the detected ID no. and serial numbers with existing inspection equipment (2). In the PDF example shown, the matching serial number links the caliper to its equipment record (3). No new inspection equipment is created in this process.

The calibration date, use decision, and report remain editable before the import is confirmed. For PDFs, Memida suggests a use decision based on the information documented in the file. Details of Conformity according to the document are shown under Extracted document data. If the PDF has no overall assessment, Memida may suggest Fit for use for visual review; you must explicitly confirm the use decision. For DCC imports, an overall assessment that can be clearly mapped may suggest the use decision; otherwise, you select it yourself. Create inspection reports imports the ready documents together with their original files; unresolved cases remain available for further editing.

Process PDF and DCC appropriately​

For PDFs, analysis supported by AI where needed assists text recognition. Each imported file must contain one calibration certificate, which may span several pages.

A digital calibration certificate (DCC) already provides structured data in XML. Memida processes versions 3.2.1 and 3.3.0 without AI analysis and checks their XML structure.

Fig. 2: DCC details and document status

The DCC details (1) provide access to the structured information. Separate status indicators (2) distinguish the version, schema validation, and signature. The original file is retained; a PDF representation generated by Memida makes it easier to read.

Schema validation and signatures

Schema valid does not confirm that an electronic signature has been verified.

Share upload and review tasks across the team​

Your uploads initially remain private. Share makes them available to other authorized users. If you have review permission yourself, you can finalize your own imports directly.

These tasks have separate permissions:

  • Upload calibration certificates allows users to upload and share their own imports.
  • Edit inspection report imports allows review, assignment, and import; it depends on Edit inspection reports, including View inspection reports.

Admin and User receive both import permissions by default; Viewer does not. Individual permissions and company and cost center access still determine the actual scope.

Effects on inventory and integrations​

Imported inspection reports contribute to the inspection equipment status and next inspection date. The existing inspection interval is retained.

Once confirmed, DCC inspection reports cannot be edited or deleted, including through the REST API. Connected applications must account for this immutability. It does not apply to PDF imports as a general rule.


The handbook describes the full workflow and how to handle unresolved details.